View Single Post
Old 12-12-2007, 02:27 PM   #1
Fr33way™
Wild for Width
 
Fr33way™'s Avatar
 
Join Date: Jan 2005
Location: Atlanta
iTrader: (23)
Posts: 6,415

Send a message via AIM to Fr33way™
What is the longest job you have taken on?

Whether it be by difficulty or frustration, what's the longest you have worked on a car?


For me it has probably been a few different suspension installs. Besides prepping and installing Ground Control coilovers on my car (around 4-5 hours including letting permatex set and doing strut bearings and bushings in the rear) I swapped two full suspensions with handtools in about 4 hours which was moving pretty quickly. I also spent 5-6 hours over two days when I pulled my manifold to clean and paint. I also move have a habit of cleaning everything so I'm sure I could be a good bit faster but it's also a hobby. I tend to break work up into multiple days also so my SINGLE longest session hasn't been much longer than 6 hours.
__________________

Last edited by Fr33way™; 12-12-2007 at 02:37 PM.
Fr33way™ is offline   Reply With Quote